Gutter Cleaning Cost in Spokane: What Builds the Number

No authority publishes a price for gutter cleaning in Spokane, and this page will not invent one. What you can actually buy is a written quote, and a quote is a set of assumptions: what a crew can reach, how much debris is up there, what happens to the debris afterwards, and whether the work needs room in the street. Set two quotes beside each other on those four points and the gap stops being mysterious.

This page is for the owner of a house they live in. Three boundaries change the arithmetic, each labelled where it appears: which jurisdiction owns the street the equipment stands in, which facility would take the debris, and whether the debris leaves the property at all. The obstruction, approach and locate rules for all three jurisdictions sit on the exterior-service pillar; the jurisdiction guide settles which one applies to an address, and the project resource router carries the office behind each question.

Quick route

Your situation The cost question that settles it Have ready
Two quotes for the same gutters differ by hundreds of dollars Whether debris disposal is inside the price or on your side of it Gutter run, number of storeys, downspout count, guard type
You intend to keep the debris and take it away yourself The current gate rate at the facility you would actually use, and which material class the load will be The facility’s rate page and its hours
The house is two storeys, or the ladder line crosses a sidewalk, parking lane or alley Whether the price includes the street owner’s obstruction permit, and who applies for it Where equipment would stand, and for how long
Work is planned for late autumn or winter Whether the price assumes one visit or a return in spring What the yard waste cart does in December, January and February

The four things a quote is really pricing

Access. The biggest assumption in most quotes is where the work happens from. A run reachable from a ladder on your own lawn is priced differently from one where the ladder must stand on a sidewalk, parking lane or alley. Ask each firm to state its access assumption, and what the price becomes if it proves wrong on the day; that sentence separates two apparently equal numbers. If the assumption is work above ground level, how it is done safely belongs to the firm doing it.

Run, shape and height. Quotes are normally built on measurement: linear feet of gutter, storeys, downspout count, and the height the gutter sits above the ground. A quote that names its basis can be compared with another; a single flat figure cannot.

Debris condition and volume. Dry leaves from a light autumn are a different job from wet, packed material, and the difference arrives as weight — the one driver that turns into a published number.

Guards. Where guards are fitted, ask whether the price lifts and refits them, leaves them in place, or excludes them, and what happens if any come away during the work. Whether guards should stay is a scope question, not a cost one.

The one part of the job with a published local price

If the debris leaves your property, it goes to one of the three self-haul locations in the regional system, and both operators publish what they charge at the gate. These are the 2026 rates, read from the operators’ own pages on 4 October 2026.

Facility Yard waste and clean green Trash and garbage
Spokane County Regional Solid Waste System — North Transfer Station, 22123 N Elk-Chattaroy Road, Colbert; Valley Transfer Station, 3941 N Sullivan Road, Spokane Valley $73.31 per ton; $11.00 minimum for 220 lb or less, including the $3 Environmental Programs Charge per vehicle $135.63 per ton; $20.00 minimum for 260 lb or less, including the same $3 charge
City of Spokane Waste to Energy Facility, 2900 S Geiger Blvd $76.95 per ton; $8.19 minimum up to 200 lb, plus a $2.68 self-haul transaction fee per vehicle $152.60 per ton; $24.93 minimum up to 320 lb, plus the same $2.68 fee

The two classes are priced far apart. Somewhere between $60 and $76 a ton separates yard waste from garbage at these gates. The class is not something a household chooses; it is decided at the gate, by the operator, on the load in front of them.

A mixed load is charged as the higher class. The City’s disposal page states that material types mixed in one load must be separated before disposal or the load will be disposed of as garbage, and that a load holding both yard waste and garbage has to go through the line twice to be charged the two rates. Ask the facility how it would treat a load that has sat through a wet run or that carries grit and roof material; that decision belongs to the operator, not to the household and not to the firm that did the work.

These are self-haul rates, not a contractor’s invoice. They are what a household pays delivering its own load; a hauling business delivering under its own commercial arrangement is billed under that arrangement. So they are the cost of keeping the debris yourself — good for reaching a decision, and not a figure to hold a contractor to.

Two rate notes. The county’s 2026 rates took effect on 1 January 2026, when its notice recorded a 4 per cent rise on garbage and 10 per cent on organics; the county also adds 3.5 per cent to card and eCheck payments at its stations. All three locations open 7:30 a.m. to 5 p.m. and close on six holidays a year.

The cart is the other route, under its own terms. Inside the City of Spokane the optional food and yard waste cart is $19.37 a month in 2026, collected weekly from March through November and one week in each of December, January and February. A cart put out on a non-collection week is billed $16.50 for the dump, the service carries a one-year commitment per cart, and cancelling within twelve months draws a $40.44 restocking fee. For routine debris that is cheap; for one heavy clean timed when collections drop to a single week, the arithmetic is different — which is why the fourth question above is about the season.

If the work needs room in the street

Equipment, a lift or a ladder standing in the street, the parking lane, the alley or on the sidewalk is occupying the public way, and that is a permit the street owner issues. The City of Spokane’s obstruction application prints $150 where the surface is cut or dug with a three-day minimum, and $40 for the first three days where it is not, with $25 and $20 for each additional day; it is due at least three business days before the start date, and a site-specific traffic control plan applies on arterials, collectors, state highways and in the central business district. Read those figures as the published shape of the fee: the City states that Development Services fees are amended annually and that the current fee schedule supersedes figures still sitting on older applications. Spokane Valley and unincorporated Spokane County publish their own right-of-way terms, including the county’s bond and insurance requirements, and the pillar records them. Whether a quote includes that permit, and who applies for it, is one of the worksheet lines below.

Put two quotes side by side

Ask each firm to answer the same twelve fields in writing.

Field What it decides
Surfaces and runs priced Which gutters and downspouts are in the number, and whether outlets are included
Basis of measurement Linear feet, storeys and downspouts, or a flat figure that cannot be compared
Access assumption Where the ladder stands, and what changes if it cannot stand there
Debris destination Left on site, bagged for your own cart, or removed
Disposal class and fee Who pays the gate fee, and which material class the number rests on
Guards Lifted and refitted, left in place, or priced separately
Downspouts and outlets Flushed and checked as far as they are reachable, or outside the price
Second visit Whether a spring return is included, and at what price
Season assumption What the number assumes about weather on the booked day
Street use and permit Whether a permit is included, who applies, and who pays
Evidence Before-and-after photographs at no extra charge
Validity How long the price holds, and what is billed for extra debris

One page, twelve fields. The aim is not to rank firms; it is to find out which line each number has left out.

Where this stops

One next step: before asking anyone for a price, write the property’s facts on one page — approximate gutter run, storeys, downspout count, guard type, where equipment could stand, where the debris would go — and ask each firm to price those terms.

Sources

All pages and documents below were opened and read on 4 October 2026.

Source Used for
Spokane County, Disposal & Transfer Stations: https://www.spokanecounty.gov/4637/Disposal-Transfer-Stations The county’s 2026 gate rates at the North and Valley transfer stations — $135.63 per ton for municipal solid waste with a $20.00 minimum for 260 lb or less; $73.31 per ton for clean green and yard waste with an $11.00 minimum for 220 lb or less; $165.00 per ton for special-handling material; the $3 Environmental Programs Charge per vehicle included in the minimums; the 3.5 per cent charge on card and eCheck payments; the two addresses, the 7:30 a.m. to 5 p.m. hours and the six holiday closures
Spokane County, Regional Solid Waste System 2026 Garbage Rates and New Appliance Disposal Fee (notice posted 24 November 2025): https://www.spokanecounty.gov/m/newsflash/Home/Detail/5841 The 2026 rate change effective 1 January 2026 — 4 per cent on garbage, 10 per cent on organics — and the county’s own 2026 rate table
City of Spokane, Disposal Locations: https://my.spokanecity.org/solidwaste/locations/ The Waste to Energy facility’s 2026 self-haul rates — $152.60 per ton for trash with a $24.93 minimum up to 320 lb plus a $2.68 self-haul transaction fee; $76.95 per ton for clean green and yard waste with an $8.19 minimum up to 200 lb plus the same fee; the rule that a load mixing material types is disposed of as garbage unless separated, and that a yard waste and garbage load must go through the line twice to be charged both rates; the shared hours and holiday closures
City of Spokane, Residential Food & Yard Waste: https://my.spokanecity.org/solidwaste/residential/food-and-yard-waste/ The optional cart service and its seasonal shape — weekly collection March through November, one week a month in December, January and February; the $16.50 charge for a cart dumped on a non-collection week; the one-year commitment per cart and the $40.44 restocking and redelivery fee
City of Spokane, Utility Billing Rates: https://my.spokanecity.org/publicworks/utility-billing/rates/ The 2026 single-family solid waste rate for the food and yard waste cart — $19.37 a month — with the 2026 winter pickup weeks
City of Spokane, 2026 Utility Rates brochure: https://static.spokanecity.org/documents/publicworks/utilitybilling/2026-utility-rates-brochure.pdf The same 2026 cart rates as published in the brochure, and the winter pickup weeks of 5–9 January, 2–6 February and 7–11 December
City of Spokane, Street Obstruction Permit Application (Rev. 20250416): https://static.spokanecity.org/documents/business/resources/applications/streetobstruction/street-obstruction-permit-application-2025-05-02.pdf The printed fees — $150 for a three-day minimum dig permit with $25 per additional day, $40 for the first three days of a non-dig permit with $20 per additional day; submission at least three business days before the start date; the site-specific traffic control plan on arterials, collectors, state highways and in the central business district, against a generic plan on local access roads
City of Spokane, Business & Development Resources: https://my.spokanecity.org/business/resources/ The standing notice that Development Services fees are amended annually and that the current fee schedule supersedes older figures still on applications and calculators

Report an error or a change you have spotted: use our contact page.


L01 · Coordinating local exterior servicesIntent: HireSources checked October 4, 2026Published October 4, 2026

This site does not give property-specific legal, engineering, tax, or medical advice. Verify rules, programmes, and provider details with the responsible authority. Spotted an error? Tell us.